10~WAFER MOUNT~ESEC WAFER
MOUNTER 650~~~MEMBRANE PRESSURE~~ACCORDING TO INS201~VISUAL INSPECTIONS~ONE READING~1XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS303~~
10~WAFER MOUNT~~~~CYLINDER PRESSURE~~ACCORDING TO INS201~VISUAL INSPECTIONS~ONE READING~1XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS303~~
10~WAFER MOUNT~~~LACK OF WAFER DAMAGES~~~ACCORDING TO INS304 AND INS305~VISUAL INSPECTIONS, MICROSCOPE~10 PIECES~2XSHIFT~VISUAL INSPECTIONS, MICROSCOPE~~STOP PRODUCTION PROCESS, ACTIONS PER INS303~~
20~WAFER SAW~~~~VACUUM LEVEL~S101
level 3~ACCORDING TO INS304 AND INS405~VISUAL INSPECTIONS~ONE READING~1XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
20~WAFER SAW~~~~BLADE HEIGHT~~ACCORDING TO INS304 AND INS405~MACHINE CONTROL~ALL PIECES~CONTINUOUS~MACHINE CONTROL, LOGS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
25~HANDLING~~~LACK OF WAFER DAMAGES~~~LACK OF WAFER DAMAGES~VISUAL INSPECTIONS~ALL PIECES~CONTINUOUS~VISUAL INSPECTIONS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
30~WASHER~~~~CLEANING / WASH TIME~~ACCORDING TO INS304 AND INS505~VISUAL INSPECTIONS~ONE CHECK~1XSHIFT~VISUAL INSPECTIONS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
30~WASHER~~~~WATER PRESSURE~~ACCORDING TO INS304 AND INS505~VISUAL INSPECTIONS~ONE CHECK~1XSHIFT~VISUAL INSPECTIONS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
40~DIE, CLIP BOND, REFLOW~~~~TEMPERATURE - ZONE 1~~ACCORDING TO INS304 AND PROCEDURE P2003_01~VISUAL INSPECTIONS~ONE READING~2XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
40~DIE, CLIP BOND, REFLOW~~~~GAS FLOW~~ACCORDING TO INS304 AND PROCEDURE P2003_01~VISUAL INSPECTIONS~ONE READING~2XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
45~INSPECTION~~~PROPER SHAPE OF BOND~~S404
level 1~ACCORDING TO CUSTOMER SPECIFICATION~MICROSCOPE~5 RANDOM BONDS~1 X AT THE BEGINNING OF SHIFT CHANGE~MICROSCOPE~~CONTACT PRODUCTION MANAGER AND QUALITY ENGINEER~~
50~MOLD~~~~CURE TIME~S202
level 1~ACCORDING TO INS304 AND INS405~VISUAL INSPECTIONS~ONE READING~2XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
50~MOLD~~~MOLD COMPOUND
VERIFICATION~~~ACCORDING TO INS304 AND INS405~VISUAL INSPECTIONS~ONE CHECK~MATERIAL REPLACEMENT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
60~TRIM AND FORM~~~~AIR PRESSURE SETTING~S301
level 3~PER INS2030~VISUAL INSPECTIONS~ONE READING~1XSHIFT~VISUAL INSPECTIONS, RECORDS~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~
60~TRIM AND FORM~~~INCOMPLETE CUT~~~PER INS2030~MACHINE CONTROL~ALL PIECES~CONTINUOUS~MACHINE CONTROL~~STOP PRODUCTION PROCESS, ACTIONS PER INS403~~